The 3-Axle Insulated Bitumen Semi-Trailer 45m3 Tank is an unpowered tank trailer built to carry hot bitumen behind a tractor unit. It runs on three axles with 12R22.5 tyres, a 100 mm insulation layer around the tank and two heaters. It suits contractors and depots that move binder in bulk between a storage site and a work area.
Because it has no engine of its own, the trailer relies entirely on the tractor for traction, braking air and electrical supply. The coupling, the lighting socket and the loaded weight rating need to be planned around the trailer rather than treated as an afterthought. A bitumen load is heavy and dense, so these details matter more than the headline volume.
Where this trailer is used
Hot bitumen is usually produced or stored at a depot and then hauled to a mixing plant, a paving site or another storage tank. A semi-trailer of this size moves a large batch in one trip, which reduces the number of tractor movements between the loading point and the destination. Insulation helps the binder stay workable while it waits in a queue or travels a long haul.
Operators who run a regular shuttle between a terminal and a plant yard will use the trailer differently from a contractor who moves binder only a few times each season. Think about how often the tank is filled, how long the load sits, and whether the discharge point has its own pump or relies on gravity.
Tank, insulation and fittings
The tank carries a 100 mm insulation layer with a 1 mm stainless steel 201 outer covering. Three manholes are fixed on top of the tank and one ladder gives access to them. A guard rail is mounted at the tank top, and ground towing and a static line plate are included as anti-static devices for filling and unloading.
At the rear there are three outlet valves for unloading, and two hose holders are fitted on the side of the tank. Two 8 m oil ropes and two 4 kg fire extinguishers, installed at the back of the tank, complete the loose equipment. Two heaters keep the binder fluid, so ask how they are fuelled and controlled.
Chassis and running gear
The running gear uses three FUWA axles, each rated at 13 ton, carrying twelve 12R22.5 tubeless tyres. Two JOST landing legs of 28 ton each support the front when the tractor is uncoupled, and a JOST 90# king pin forms the connection. The main beam is heavy duty and designed for durability.
Overall dimensions are approximately 12770 × 2550 × 3800 mm and the curb weight is approximately 13800 kg. The side guards and the fixed rear bottom guard are aluminium. A tool box and a spare tyre rack are fitted, and the lighting works through a 24V 7-pin socket with rear lights, turn signals, reflectors and side marker lights.
What to confirm before ordering
Several figures depend on the final configuration and are confirmed in the quotation: the usable tank volume, the tank shell material, the permitted payload and the loaded weight of the whole combination. Do not assume that a large volume equals an equally large permitted payload, because bitumen density and axle limits both apply to the finished trailer.
Also confirm the coupling height of the tractor you plan to use, the match between its 24V socket and the trailer cable, the heater fuel and control arrangement, and the valve and hose connections needed at your discharge point. If you want items beyond the standard equipment, ask for them to be written into the quotation.
Request a current quotation for your selected configuration, quantity and delivery terms.